New dryer on the gypsum line
Services : Engineering, manufacturing, and installation
Industry : Construction materials
Budget : $500K
Challenge : Work during annual shutdown and a tight deadline.
Place : Mississauga, ON, Canada
Date : 2015-2016
Engineering, manufacturing, and installation of dryer for gypsum panels.
Nouvelle-secherie-sur-ligne-de-gypse